This is a list of EVAs conducted or scheduled to be conducted in 2008.
|
Spacewalkers |
Start (UTC) |
End (UTC) |
Duration |
Notes |
|
Expedition 16 |
Peggy Whitson |
January 30, 2008 |
January 30, 2008 |
7 hours, 10 minutes |
Replaced the Bearing Motor Roll Ring Module (BMRRM) on one of the station's solar wings, inspection of Solar Alpha Rotary Joint (SARJ).[8] |
|
| ||||||
STS-122 |
February 11, 2008 |
February 11, 2008 |
7 hours, 58 minutes |
|
| |
STS-122 |
Rex J. Walheim |
February 13, 2008 |
February 13, 2008 |
6 hours, 45 minutes |
P1 Truss Nitrogen (N2) tank assembly installation, stowage of old N2 tank assembly into payload bay, Station-to-Shuttle Power Transfer System (SSPTS) routing. |
|
STS-122 |
Rex J. Walheim |
February 15, 2008 |
February 15, 2008 |
7 hours, 25 minutes |
Installation of SOLAR telescope, and EuTEF facility onto an External Stowage Platform (ESP) on Columbus, retrieval of failed Control Moment Gyroscope (CMG) that was replaced on STS-118 and stowed on ESP2, installation of failed CMG into payload bay, installation of keel pin cloth covers on Columbus. |
|
| ||||||
STS-123 |
Richard M. Linnehan |
March 14, 2008 |
7 hours, 1 minute |
Installation of ELM-PS and Dextre assembly. |
| |
STS-123 |
Linnehan |
March 15, 2008 |
7 hours, 8 minutes |
Dextre assembly (cont.). |
| |
STS-123 |
Linnehan |
March 17, 2008 |
March 18, 2008 |
6 hours, 53 minutes |
Dextre assembly (cont.), prepare the Spacelab Logistics Pallet for landing, transfer a spare Canadarm2 yaw join, transfer two spare Direct Current Switching Units Mission and unsuccessful attempted installation of the MISSE 6 experiment on the exterior of the Columbus module. |
|
STS-123 |
Behnken |
March 20, 2008 |
March 21, 2008 |
6 hours, 24 minutes |
Replacement of Remote Power Control Module and test of tile repair material. Removal of a sock covering the left hand of Dextre and some launch locks on Harmony. Release launch locks on Harmony’s port and nadir Common Berthing Mechanisms |
|
STS-123 |
Behnken |
March 22, 2008 |
March 23, 2008 |
6 hours, 02 minutes |
Storage of Shuttle Orbiter Boom Sensor System on the Station, installation of ELM‐PS trunnion covers, removed five covers from the starboard SARJ and performed inspections, captured digital photography, successful installation of the MISSE 6 experiment on the exterior of the Columbus module and debris collection. |
|
| ||||||
STS-124 |
Ronald J. Garan, Jr. |
June 3, 2008 |
June 3, 2008 |
6 hours, 48 minutes |
Release straps on shuttle robotic arm elbow joint camera. Transfer OBSS back to the shuttle. Prepare Kibō for installation. Replace trundle bearing assembly on the starboard solar alpha rotary joint (SARJ). Inspect damage to SARJ. Test cleaning methods for use on the SARJ race ring. |
|
STS-124 |
Garan |
2008-06-05 |
|
7 hours, 11 minutes[9] |
Installation of covers and external television equipment on the JEM and preparation of RMS. Preparation for relocation of ELM-PS. Prepare a depleted nitrogen tank assembly for removal and a new one stowed on an external stowage platform for installation. Remove television camera with a failed power supply. |
|
STS-124 |
Garan |
|
2008-06-08 |
6 hr 33 min |
Remove and replace starboard nitrogen tank assembly. Finish outfitting of Kibō laboratory. Reinstall removed television camera with repaired power supply. |
|
| ||||||
Expedition 17 |
Sergei Volkov |
2008-07-10 |
2008-07-11 |
6 hr 18 min |
Remove pyrotechnic bolt from docked Soyuz |
|
Expedition 17 |
Volkov |
2008-07-15 |
5 hr 54 min |
Installation of a docking target on the Zvezda service module. Installation of Vsplesk experiment. Straightening of ham radio antenna. Retrieval of Biorisk experiment. |
|
Editor:Yang Jie